• FluTrackers.com Inc. does not provide medical advice. Information on this web site is collected from various internet resources, and the FluTrackers board of directors makes no warranty to the safety, efficacy, correctness or completeness of the information posted on this site by any author or poster. The information collated here is for instructional and/or discussion purposes only and is NOT intended to diagnose or treat any disease, illness, or other medical condition. Every individual reader or poster should seek advice from their personal physician/healthcare practitioner before considering or using any interventions that are discussed on this website. By continuing to access this website you agree to consult your personal physican before using any interventions posted on this website, and you agree to hold harmless FluTrackers.com Inc., the board of directors, the members, and all authors and posters for any effects from use of any medication, supplement, vitamin or other substance, device, intervention, etc. mentioned in posts on this website, or other internet venues referenced in posts on this website.
  • We are not asking for any donations. Do not donate to any entity who says they are raising funds for us.

Critical paths in a metapopulation model of H1N1: Efficiently delaying influenza spreading through flight cancellation

tetano

Editor, Senior Moderator
PLoS Curr. 2012 Apr 23;4:e4f8c9a2e1fca8.
Critical paths in a metapopulation model of H1N1: Efficiently delaying influenza spreading through flight cancellation.
Marcelino J, Kaiser M.
Abstract

Disease spreading through human travel networks has been a topic of great interest in recent years, as witnessed during outbreaks of influenza A (H1N1) or SARS pandemics. One way to stop spreading over the airline network are travel restrictions for major airports or network hubs based on the total number of passengers of an airport. Here, we test alternative strategies using edge removal, cancelling targeted flight connections rather than restricting traffic for network hubs, for controlling spreading over the airline network. We employ a SEIR metapopulation model that takes into account the population of cities, simulates infection within cities and across the network of the top 500 airports, and tests different flight cancellation methods for limiting the course of infection. The time required to spread an infection globally, as simulated by a stochastic global spreading model was used to rank the candidate control strategies. The model includes both local spreading dynamics at the level of populations and long-range connectivity obtained from real global airline travel data. Simulated spreading in this network showed that spreading infected 37% less individuals after cancelling a quarter of flight connections between cities, as selected by betweenness centrality. The alternative strategy of closing down whole airports causing the same number of cancelled connections only reduced infections by 18%. In conclusion, selecting highly ranked single connections between cities for cancellation was more effective, resulting in fewer individuals infected with influenza, compared to shutting down whole airports. It is also a more efficient strategy, affecting fewer passengers while producing the same reduction in infections.

PMID:
22919563
[PubMed]
PMCID:
PMC3392097

Free full text

http://www.ncbi.nlm.nih.gov/pubmed/22919563
 
Back
Top Bottom